TROUT EXPERT CLEAR FLOAT—TRUE TO WEIGHT HEAVY LINE
Achieve stealthy and delicate trout presentations with the Trout Expert Clear Float fly line. This next-generation clear floating line utilizes naturally buoyant polymers and features a 10' clear floating tip for fooling wary fish. Advanced DuraCoat technology employs a dual-polymer design, combining a supple core for minimal memory and strong adhesion with a robust outer layer for superior slickness and abrasion resistance. Enhanced with EST+ for unmatched durability and smooth shooting, the line also boasts a Floating Texture on the tip for maximum flotation and a Shooting Texture running line for longer casts. Its revised compound taper ensures exceptionally delicate fly delivery. Optimal performance is above 50°F/10°C, with manual stretching recommended below this temperature.
FEATURES:
• Optimized for use above 50F/10C. This line can be fished below
those temperatures, but will require stretching by hand to manage
coils.
• DuraCoat leverages advanced dual-polymer design to optimize line
stiffness, abrasion resistance, and slickness. The core is enveloped
by a supple material, promoting minimal memory and strong
adhesion, while the outer layer boasts a robust composition that
significantly enhances slickness and abrasion resistance.
• Enhanced with EST+ slickness additive for unmatched durability,
smoother shooting, and eco-friendly performance.
• Using naturally buoyant polymers, we’ve created the next
generation of clear floating lines.
• The 10' clear floating tip allows for the ultimate stealth when
presenting flies to highly pressured fish.
• Floating Texture on the tip section for the ultimate in flotation;
Shooting Texture running line delivers longer casts
• Revised compound taper for delicate deliveries