Scientific Anglers Amplitude Textured Trout Expert freshwater dry fly line
Scientific Anglers Amplitude Textured Trout Expert fly line - detail view
Scientific Anglers Amplitude Textured Trout Expert fly line - detail view

Scientific Anglers Amplitude Textured Trout Expert

Regular price $129.95
/
Shipping calculated at checkout.

Not sure what matches this item?
Click “Check Compatibility” below.



By placing your order you agree to purchase from Global-e as the merchant of record, subject to Global-e’s Terms and Conditions and Privacy Policy, and share your information with Stillwater Fly Shop.

TRUE TO WEIGHT LINE

The first series of lines to feature the revolutionary AST PLUS slickness additive, Amplitude Textured series will shoot farther and last longer than any other line on the market. It’s slickness down to a science.

  • Revolutionary AST Plus slickness additive for superior shooting ability and increased durability
  • Floating Texture on the tip section for the ultimate in flotation; it simply keeps dry flies floating longer
  • Shooting Texture running line delivers longer casts, thanks to a reduction in friction
  • Excels in medium-to-long distances with dry flies and smaller nymphs; wonderful on glass and bamboo
  • The best, true-to-grain-weight line for casting small dry flies to picky risers
  • Elongated front taper is designed for delicate presentations 
  • For use in moderate and cold climates

APPLICATIONS: Cold & Medium Temps, Dries, Nymphs

Key Features

  • SA Line ID
  • AST Plus
  • Improved Dry Tip
  • Shooting Texture
  • Welded Loops
  • Floating Texture
  • Tactical Reference Point

Built from the specifications of your selected option and validated by Stillwater Fly Shop staff.

Questions? Call us, email us, or reach out through chat.

Customer Reviews
0.0 Be the first to review this item
5 ★
0% 
0
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review Ask a Question
Customer Reviews
0.0 Be the first to review this item
5 ★
0% 
0
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review Ask a Question